Myanmar Pharmaceutical Factory (MPF)
Wastewater Treatment Plant
- Capacity: 30,000 GPD (114 m³/day)
- Scope: EPC Turnkey Delivery
- Treatment Process: Industrial Pharmaceutical Wastewater Treatment
- Application: Pharmaceutical Manufacturing Facility
- Status: Successfully Commissioned
Location: Yangon, Myanmar
Myanmar Smelting & Refining Company
Industrial Wastewater Treatment Plant
- Capacity: 4 m³/hr (96 m³/day)
- Scope: Design, Supply, Installation & Commissioning
- Treatment Process: Heavy Metal & Industrial Effluent Treatment System
- Application: Metallurgical & Refining Wastewater Treatment
- Status: Successfully Completed & Operational
Location: Myanmar
Crumb Rubber Factory
Industrial Wastewater Treatment Plant
- Capacity: 100,000 GPD (455 m³/day) / 20 m³/hr
- Scope: Engineering, Procurement, Construction, Installation & Commissioning
- Treatment Process: Physicochemical Treatment followed by Biological Treatment
- Application: Rubber Manufacturing Wastewater Treatment
- Status: Successfully Completed & Operational
Location: Kyaik Hto, Mon State, Myanmar
Pickled Tea Leaves & Assorted Fried Beans Production Facility
Wastewater Treatment System
- Capacity: 3 m³/hr (72 m³/day)
- Scope: Design, Supply, Installation & Commissioning
- Treatment Process: Primary Settler + UASB + Anoxic + Aerobic + Multimedia Filtration + Disinfection
- Application: Food Processing Wastewater Treatment
- Status: Successfully Completed & Operational
Location: Mandalay, Myanmar
Yoma Top Latex Rubber Factory
Wastewater Treatment Plant
- Capacity: 20,000 GPD (91 m³/day) / 12 m³/hr
- Scope: Engineering, Procurement, Construction & Commissioning
- Treatment Process: Coagulation, Flocculation & Dissolved Air Flotation (DAF)
- Application: Latex Rubber Processing Wastewater Treatment
- Status: Successfully Completed & Operational
Location: Indagaw, Bago Region, Myanmar
REMARKABLE PROJECTS
1). MOBILE CRANE
Provision of Mobile Crane & Spare Parts
Model No. : GMK 3055 (Germany)
To SHWE Project (POSCO DAEWOO E&P)

2). 5 Ton & 25 Ton Trucks
Cargo Trucks (5-MT) & (25-MT), (KOREA)
To SHWE Project (POSCO DAEWOO E&P)
3) Toyota Double Cab Pick-Up for onshore operation at ZOC and ZMS PTTEPI
4) CMS-2 Bitumen with Double Layer Drum to Total E&P Myanmar
5) TAR Road Construction at PLC Compount (PCML)
6) Drip Pan Modification at Metering Station (PCML)
7) Steel Structure Construction at French School (Total)
8) Telenor Core Site Construction at Pathein
9) Telenor Core Site Construction at Mawlamyaing
10) MPT Tower Foundation Construction & Telecommunication Tower Erection Projects at Mon State (YAE) (AMC -2015)
11) MPT Tower Foundation Construction & Telecommunication Tower Erection Projects at Mon State (AMC – 2015)